{"id":333,"date":"2026-03-28T04:04:20","date_gmt":"2026-03-27T19:04:20","guid":{"rendered":"https:\/\/www.mita-row.com\/ja\/?page_id=333"},"modified":"2026-05-17T09:43:14","modified_gmt":"2026-05-17T00:43:14","slug":"%e5%b0%8e%e5%85%a5%e3%83%95%e3%83%ad%e3%83%bc","status":"publish","type":"page","link":"https:\/\/www.mita-row.com\/en\/?page_id=333","title":{"rendered":"Implementation Flow"},"content":{"rendered":"<h2 data-start=\"459\" data-end=\"476\">The MITA-ROW Implementation Process<\/h2>\n<h3 data-start=\"478\" data-end=\"496\">1. Inquiry and Request for Materials<\/h3>\n<p data-start=\"497\" data-end=\"536\">Please contact us via the email address listed on the Contact page.<br \/>\nWe will ask briefly about your current boat class, crew size, and intended use.<\/p>\n<h3 data-start=\"497\" data-end=\"536\">2. Consultation and Demo Discussion<\/h3>\n<p>Through an online or in-person consultation, we will discuss:<\/p>\n<ul>\n<li>Which boat class you plan to use<\/li>\n<li>What you want to understand or analyze<\/li>\n<li>How you intend to use the system during training and races<\/li>\n<\/ul>\n<p>Based on this, we will recommend the most suitable system configuration.<\/p>\n<p>&nbsp;<\/p>\n<h3 data-start=\"612\" data-end=\"635\"><\/h3>\n<h3 data-start=\"612\" data-end=\"635\">3. Demo and Video Capture Verification (Rental Available)<\/h3>\n<p>The system can be mounted on an actual boat so you can confirm:<\/p>\n<p>* Camera angles<br \/>\n* How the video appears in practice<br \/>\n* The overall analysis workflow and output image<\/p>\n<p>&nbsp;<\/p>\n<h3 data-start=\"706\" data-end=\"718\">4. Finalizing the System Configuration<\/h3>\n<p>Based on the boat class, crew size, and intended use, we will determine:<\/p>\n<p>* The required base system configuration<br \/>\n* Whether optional features are needed<\/p>\n<p>&nbsp;<\/p>\n<h3 data-start=\"775\" data-end=\"782\">5. Installation and Start of Operation<\/h3>\n<p data-start=\"804\" data-end=\"844\">The system can be introduced naturally into regular training sessions and races.<br \/>\nNo special operation skills or large-scale preparation are required.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The MITA-ROW Implementation Process 1. Inquiry and Request for Materials Please contact us via the email addre [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":369,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-333","page","type-page","status-publish","has-post-thumbnail","hentry","has-post-title","has-post-date","has-post-category","has-post-tag","has-post-comment","has-post-author",""],"_links":{"self":[{"href":"https:\/\/www.mita-row.com\/en\/index.php?rest_route=\/wp\/v2\/pages\/333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mita-row.com\/en\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mita-row.com\/en\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mita-row.com\/en\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mita-row.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=333"}],"version-history":[{"count":13,"href":"https:\/\/www.mita-row.com\/en\/index.php?rest_route=\/wp\/v2\/pages\/333\/revisions"}],"predecessor-version":[{"id":1104,"href":"https:\/\/www.mita-row.com\/en\/index.php?rest_route=\/wp\/v2\/pages\/333\/revisions\/1104"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mita-row.com\/en\/index.php?rest_route=\/wp\/v2\/media\/369"}],"wp:attachment":[{"href":"https:\/\/www.mita-row.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}